Skip to content

Longlife – Electrical Service upgrade

GayLea Foods Cooperative Ltd.,

Power Voltage drops and inconsistences in power quality hampered the production process in this milk processing plant. Allyant engineered a solution to correct these operational difficulties and to increase the overall power available at the site. A new two storey electrical sub-station building was constructed and the existing distribution network systematically transferred to the new distribution network without loss of productivity in the plant.

Method of Execution: Turnkey (Design-Build)

Are you ready to get started?

Let's talk about your next project

Scroll To Top